- Butler Taconite operated the site
from 1967-1984, producing 120 million long tonnes of ore and 39
million tonnes of concentrate until closing upon the bankruptcy of
Wheeling Steel, a principal owner.
- Extensive drilling of 1,600+ holes
and prior operating data confirm the remaining 100-year reserve.
- The 20,000 to 24,000 acre project
area meets requirements for tailings disposal and plant site
buffer.
- Key nearby infrastructure includes two
36” natural gas pipelines, a sizeable power grid, two rail carriers,
and the sea port of Duluth, Minn., 80 miles southeast.